






🎮 Elevate your entertainment — long, fast, flawless!
This 25-meter True HQ™ HDMI cable delivers high-speed 1080p video and immersive audio with Ethernet, ARC, and 3D support. Featuring 24K gold-plated connectors and double shielding, it ensures interference-free signal transmission over long distances. Compatible with a wide range of devices including PS4, Xbox One, Sky HD TV, and PCs, it’s designed in the UK and backed by a 3-year warranty for reliable, premium performance.
D**D
It's a 10m HDMI cable that does its job
If you want a 10m HDMI cable then this is for you. If you want a 20m HDMI cable, look elsewhere.It does what it says on the tin, it's long (10m) and it carries a decent signal from my PC all the way to my Projector on the other side of the room.
D**3
Didn't work for me.
Wanted to link my Dell Inspiron 3662 to my Panasonic TX-26LXD80 but unfortunately it didn't work as the PC didn't recognise the TV. I did test the cable by linking a Humax box to the TV and that was OK although the cable took some persuading to establish a firm connection.It seems a bit extreme to return the cable to get back £6.95!
R**N
Great product!
This cable makes it really easy me to switch between watching things on my monitor and TV, as these are both on opposite ends of the room. It's a high-quality thick cable which is naturally very durable.
P**S
Not sure it works with sky Q
Was hopeful thus would work with sky q and enable an outside TV to work. No, it didn't. Not sure why yet but will try next time I have the TV outside.
A**S
10 metre hdmi cable.
I've had this cable for a couple of months now and it has performed perfectly. I use it to connect my security cameras to a monitor and the picture is great.
Trustpilot
1 day ago
3 weeks ago
1 month ago
1 month ago